Picture Gallery 1 |
Archive Pictures |
Reproduced with permission of Northumbrian Water |
Photographs of the Dam and Waterworks under construction 1901 - 1908 taken mainly 1904-1905 |
EARLY DAYS |
![]() |
Measuring the water flow on the Font |
THE HUTTED SETTLEMENT |
![]() |
Main Street |
![]() |
Mission House and Canteen looking towards the station: June 1905 |
![]() |
View from south end of viaduct |
![]() |
"Bottom house" and settlement : Distribution House under construction |
![]() |
Distribution House built |
FILTER BEDS UNDER CONSTRUCTION |
![]() |
![]() |
![]() |
![]() |
Note : view of Font valley prior to dam being built |
![]() |
![]() |
INLET TUNNEL AND WATER TOWER UNDER CONSTRUCTION |
![]() |
Tunnel inlet 1902 : early stages |
![]() |
![]() |
![]() |
"Top House" in background fixes location |
![]() |
![]() |
![]() |
![]() |
![]() |
The completed water tower |
TUNNEL OUTLET FROM THE OVERFLOW |
![]() |
![]() |
![]() | ![]() |
![]() |
![]() |
![]() |
Note : no dam yet, enabling a view of the valley |
RESERVOIR OVERFLOW CONSTRUCTION |
![]() |
Overflow shaft under construction |
![]() |
![]() |
Overflow shaft completed |
![]() |
Is this the base of overflow shaft? |
![]() |
Outflow tunnel from base of overflow shaft |
![]() |
DAM UNDER CONSTRUCTION |
![]() |
![]() |
![]() |
![]() |
1903 Dam foundations trench 92 feet deep |
![]() |
![]() |
Partially built dam with water tower still visible: August 1905 |
![]() |
View north - south |
![]() |
Same view: "Top House" features |
![]() |
As before |
![]() |
View south - north |
![]() |
Embankment from the office: Simonside visible on horizon: October 1905 |
![]() |
Progress |
HORSES, MACHINERY AND MEN AT WORK |
![]() |
"Billie" |
![]() |
"Birdie" |
![]() |
Tattoo: May 1904 |
![]() |
Ruston portable 8hp engine |
![]() |
Steam roller: July 1905 |
![]() |
Trench concrete mixing plant: September 1904 |
![]() |
Steam "Navvy" |
![]() |
Navvies at work |
HANDSOME BUILDINGS |
![]() |
The Distribution House |
![]() |
The Distribution House with "Bottom House" behind |
![]() |
Inside the Distribution House |
![]() |
Distribution basin valves: July 1905 |
![]() |
Pure water tank: 1904 |
![]() |
Completed Valve House |
![]() |
Recorder House: July 1905 |
PERSONNEL |
![]() |
1904: Engineers and staff |
![]() |
![]() |
Bowler-hatted Water Corporation visit 1905 |
Website created by WarrenAssociates 2007 Website hosted by Vidahost Copyright © Maud Isabel Warren 2008 |
To go to Home Page use the link below only if there is no menu bar on the left for "Return to Home page" www.Fontburnremembered.co.uk |