Picture Gallery 1

Archive Pictures

Reproduced with permission of Northumbrian Water

Photographs of the Dam and Waterworks under construction 1901 - 1908 taken mainly 1904-1905

EARLY DAYS

Measuring the water flow on the Font

THE HUTTED SETTLEMENT

Main Street

Mission House and Canteen looking towards the station: June 1905

View from south end of viaduct

"Bottom house" and settlement : Distribution House under construction

Distribution House built

FILTER BEDS UNDER CONSTRUCTION

Note : view of Font valley prior to dam being built

INLET TUNNEL AND WATER TOWER UNDER CONSTRUCTION

Tunnel inlet 1902 : early stages

"Top House" in background fixes location

The completed water tower

TUNNEL OUTLET FROM THE OVERFLOW

Note : no dam yet, enabling a view of the valley

RESERVOIR OVERFLOW CONSTRUCTION

Overflow shaft under construction

Overflow shaft completed

Is this the base of overflow shaft?

Outflow tunnel from base of overflow shaft

DAM UNDER CONSTRUCTION

1903 Dam foundations trench 92 feet deep

Partially built dam with water tower still visible: August 1905

View north - south

Same view: "Top House" features

As before

View south - north

Embankment from the office: Simonside visible on horizon: October 1905

Progress

HORSES, MACHINERY AND MEN AT WORK

"Billie"

"Birdie"

Tattoo: May 1904

Ruston portable 8hp engine

Steam roller: July 1905

Trench concrete mixing plant: September 1904

Steam "Navvy"

Navvies at work

HANDSOME BUILDINGS

The Distribution House

The Distribution House with "Bottom House" behind

Inside the Distribution House

Distribution basin valves: July 1905

Pure water tank: 1904

Completed Valve House

Recorder House: July 1905

PERSONNEL

1904: Engineers and staff

Bowler-hatted Water Corporation visit 1905

Website created by WarrenAssociates 2007

Website hosted by Vidahost

Copyright © Maud Isabel Warren 2008

To go to Home Page use the link below only if there is no menu bar on the left for "Return to Home page"
www.Fontburnremembered.co.uk